Connect with us

TOP STORIES

J&K braces for 7 GW winter load by 2030 | KNO

Emergency Power Supply load projected to reach 4,211 MW

Published

on

kno news

Srinagar, Apr 21 (KNO): In a stark warning, Jammu and Kashmir has indicated that a power load requirement of up to 7 Gigawatts (GWs) by the coming five years needs to be considered in the winter season—signaling major infrastructure upgrades to avoid seasonal blackouts. However, the officials have conservatively trimmed the load requirement to 5 GW by the financial year 2029-30. According to the news agency—Kashmir News Observer (KNO), the statutory body Northern Regional Power Committee (NRPC) in a joint study meeting has said that “J&K indicated that a load of 6-7GW needs to be considered in the winter season by 2029-30.” “However, on conservative side load is considered to the tune of 5 GW,” it reads. Stating the details of Northern Region states load considered in Power System Simulator for Engineering (PSSE) for 2029-2030, the committee has projected 4211 Megawatts (MWs) of Emergency Power Supply (EPS) load in J&K by 2029-2030 timeframe. However, the load considered in the revised PSSE file is 5000 MWs. Pertinently, as already reported by KNO, Jammu and Kashmir was importing more than 95 percent of its electricity in the month of December. The officials earlier in the month had informed that Jammu and Kashmir is importing electricity ranging from 2900 MWs to 3100 MWs during the peak hours. It also said that during the other hours, the region is importing electricity ranging from 2400 MWs to 2800 MWs. The official however had clarified that the power import includes all the sources including the power allocated from the center and other Power Purchase Agreements (PPAs). Earlier the news agency reported that Jammu and Kashmir is likely to face a four percent Compound Annual Growth Rate (CAGR) increase in electricity requirement and six percent increase in peak electricity demand for the period of 2025-26 to 2035-36. The official documents in this regard reveal that it has considered electrical energy requirement projections as per J&K State Load Dispatch Center (SLDC). The documents further reveal that the SLDC has projected that the annual electrical energy requirement of the UT is likely to grow at a CAGR of 4 percent while the peak electricity demand for the utility is likely to grow at a CAGR of 6 percent for the period of 2025-26 to 2035-36—(KNO)

Trending

TOP STORIES ago

Centre, state must ensure no repeat of Pahalgam attack: CM Omar | KNO

TOP STORIES ago

Pahalgam Terror Attack Anniversary: LoC areas witness anti-terror protests, locals pay tributes to victims | KNO

TOP STORIES ago

Civil defence mock drills, blackout exercises to be held in Kashmir districts | KNO

TOP STORIES ago

2017 Fidayeen Attack On CRPF Lethpora Camp | KNO

TOP STORIES ago

Nation pays tribute to Pahalgam terror attack victims, expresses solidarity with families | KNO

TOP STORIES ago

10 lakh tourists visit Pahalgam since Baisaran terror attack: Official data | KNO

TOP STORIES ago

Year after Pahalgam terror attack, tourism picks up amid beefed up security in Kashmir | KNO

TOP STORIES ago

‘Tourists our honour’: Gulmarg stakeholders express solidarity with Pahalgam attack victims | KNO

TOP STORIES ago

Tourist footfall at Sonamarg nears 2 lakh in first quarter of 2026 | KNO

TOP STORIES ago

Pahalgam Terror Attack Anniversary | KNO

TOP STORIES ago

Yasin Malik had links with Pakistan leadership: NIA tells Delhi High Court | KNO

TOP STORIES ago

89 percent qualify 12th exams in Jammu division | KNO

TOP STORIES ago

Earth Day: Experts warn of ecological crisis as wetlands decline in J&K | KNO

TOP STORIES ago

‘2014 floods left deep silt scars on Hygam Ramsar site’ | KNO

TOP STORIES ago

Paramedical students at GMC Sgr protest ‘unfair’ fee structure | KNO

TOP STORIES1 hours ago

PM Modi has written J&K’s new destiny: LG Sinha | KNO

TOP STORIES1 hours ago

4 drug peddlers arrested in Handwara, Kupwara & Budgam: Police | KNO

Copyright © 2021